The Crompton Greaves' Operations Overhaul
|
|
ICMR HOME | Case Studies Collection
To download The Crompton Greaves' Operations Overhaul case study
(Case Code: OPER003) click on the button below, and select the case from the list of available cases:
» Operations Case Studies
» Case Studies Collection
» ICMR HOME
» Operations Short Case Studies
» View Detailed Pricing Info
» How To Order This Case » Business Case Studies » Case Studies by Area
» Case Studies by Industry
» Case Studies by Company
Please note:
This case study was compiled from published sources, and is intended to be used as a basis for class discussion. It is not intended to illustrate either effective or ineffective handling of a management situation. Nor is it a primary information source.
Chat with us
Please leave your feedback
|
Case Details: |
Price: |
Case Code |
: |
OPER003 |
For delivery in electronic format: Rs. 200; For delivery through courier (within India): Rs. 200 +Shipping & Handling Charges extra
ThemesOperational Restructuring |
Case Length |
: |
05 Pages |
Period |
: |
1990-2000 |
Organization |
: |
Crompton
Greaves |
Pub Date |
: |
2002 |
Teaching Note |
: |
Available |
Countries
|
: |
India |
Industry |
: |
Electrical
Equipment |
Abstract:
The case presents the changes introduced by Crompton Greaves, an electrical
equipment manufacturer in India, on the operational front at one of its plants
in Nashik, Maharastra. Examining in detail the changes made in operational and
human resources practices at the Nashik's switchgear factory, it discusses the
efficacy of these changes in boosting productivity.
|
|
Issues:
» Crompton Greaves', single piece flow system, operations overhaul, Kaizen,
Andon
Contents:
Keywords:
Crompton Greaves, electrical, equipment, manufacturer, India,
operational front, Nashik, Maharastra, operational, human resources practices,
switchgear factory, efficacy, boosting productivity
The Bluechip's Downfall
- Next Page>>
|
|