Lean Manufacturing Initiatives at Boeing

Lean Manufacturing Initiatives at Boeing
Case Code: OPER014
Case Length: 12 Pages
Period: 1993 - 2002
Pub Date: 2002
Teaching Note: Available
Price: Rs.300
Organization: Boeing
Industry: Airplane Manufacturing
Countries: USA
Themes: Production management, manufacturing
Lean Manufacturing Initiatives at Boeing
Abstract Case Intro 1 Case Intro 2 Excerpts

Manufacturing Practices at Boeing

In a traditional commercial aircraft manufacturing plant, the floor layout was similar to a parking lot. The planes were docked in stalls – six on the left side of the factory, six on the right side. Each plane was surrounded by ramps and workers would go in and out to find parts, install them. Boeing had followed the above approach from the beginning and its manufacturing practices did not change much over the years. According to analysts, by the early 1990s, the company's operations had become completely outdated...

Buy this case study (Please select any one of the payment options)

Price: Rs.300
Price: Rs.300
PayPal (7 USD)

Custom Search